🔥 Furniture tour to Guangzhou — December 2026. Programme and booking
ASIO · Cairo
ASIO PROJECTS

Restaurant and café tables in Cairo

Specify complete tables or coordinate tops and bases as separate items. Round, square and rectangular layouts should suit the seating, circulation and arrangements used during service.

Furnishing ideas

Suitability, dimensions, materials and availability are confirmed during sourcing.

Original photograph · model reference

Dining table

Original photograph · model reference

Dining chair

Browse catalog

A sample collection of the models shown here. Ask ASIO for the full catalog and current ordering terms.

GUANGZHOU · FOSHAN

Furniture tour itinerary

Choose a date and topics, then save a preliminary itinerary in your brief.

Enquiries and bookings require separate confirmation.

Furniture tour itinerary
Topics

Preparing your project

Site conditions

Before approving large pieces, measure the entire route from the vehicle to the room. Gates, doors, lifts and corners may require a knock-down design or separately packed modules.

Receiving furniture on site

Provide the full address, receiving party, vehicle and doorway clearances, lift access and temporary storage space. Unloading, moving furniture to its final position and installation are agreed separately. Work backwards from the target furnishing completion date through samples, production, packing, transport and site readiness.

Your first ASIO brief

Save furniture and interior references to your selection. Add the city, property type, number of spaces and target furnishing completion date. Separate essential items from alternatives so the initial quotation can compare a clear scope.

Interior images are visual references for discussion. They are not presented as ASIO projects completed in this city.

Dimensions and seating

Define place settings, guest counts, height and overall size. Requirements such as an 80 × 80 cm top or a 900 mm round top guide selection; they do not imply an available stock model.

Tabletops and bases

Compare stone, wood, glass and other finishes by cleaning and intended use. Check the base against top weight, leg clearance and fixings before production.

Bar, folding and terrace tables

Pair high tables with correctly sized seating. Agree folding mechanisms and storage requirements separately. Umbrella openings, outdoor finishes and joint protection need a specific brief.

Project delivery and furniture installation

For projects in Russia and other countries, ASIO agrees the furniture specification and delivery plan after receiving the destination city, address and item schedule. The quotation defines the route, receiving party, shipment contents, packaging and delivery stages. Naming a city does not imply local stock: lead times depend on production and transport.

ASIO can arrange installation by separate agreement. Confirm the scope, contractor, cost, site readiness, unloading and access arrangements before ordering. Built-in items and floor fixings require approved drawings and substrate requirements.

For an initial quotation, send the project city, floor plans, furniture schedule, quantities and target furnishing completion date. For phased delivery, indicate when each space will be ready to receive furniture.

Furnishing questions

Can we order tops or bases only?

Provide dimensions, top weight, existing fixing details and quantities. Compatibility must be confirmed through drawings or a sample before the order is finalised.

ASIO

Project assistant

Save an interior or furniture reference. The assistant will collect them in a brief for your consultation.

Cairo

Topics: Furniture

Plans, spaces, quantities, timing and delivery city help us prepare a quote.

Contact ASIO

Request a consultation

We use these details to respond to your request. Privacy policy