Hotel casegoods and guestroom furniture in Istanbul
Coordinate wardrobes, nightstands, desks, dressers and TV units in one guestroom schedule. Consistent dimensions, maintenance access and interfaces with building services matter as much as the finish.
A different mood for every space.
Interiors are visual references for selection, not completed-project claims.
Furnishing ideas
Suitability, dimensions, materials and availability are confirmed during sourcing.
Original photograph · model reference
Wardrobe
Original photograph · model reference
Desk
Browse catalog
A sample collection of the models shown here. Ask ASIO for the full catalog and current ordering terms.
Furniture tour itinerary
Choose a date and topics, then save a preliminary itinerary in your brief.
Enquiries and bookings require separate confirmation.
Furniture tour itineraryPreparing your project
Site conditions
Before approving large pieces, measure the entire route from the vehicle to the room. Gates, doors, lifts and corners may require a knock-down design or separately packed modules.
Receiving furniture on site
Provide the full address, receiving party, vehicle and doorway clearances, lift access and temporary storage space. Unloading, moving furniture to its final position and installation are agreed separately. Work backwards from the target furnishing completion date through samples, production, packing, transport and site readiness.
Your first ASIO brief
Save furniture and interior references to your selection. Add the city, property type, number of spaces and target furnishing completion date. Separate essential items from alternatives so the initial quotation can compare a clear scope.
Interior images are visual references for discussion. They are not presented as ASIO projects completed in this city.
The guestroom package
List the wardrobe, bedside tables, writing desk, luggage bench, console and minibar cabinet separately. Appliance cabinets require actual equipment dimensions and the manufacturer's ventilation requirements.
Materials and construction
Confirm substrates, faces, edges, hardware and fixings. Review finish samples alongside flooring and wall finishes. Charging modules and integrated lighting require an agreed electrical specification.
Repeatable room sets
Document quantities for every room type. Building, floor and room labels support receiving and installation planning; spare fronts and hardware should be separate scheduled items.
Guestroom chairs, sofas and work areas
Review guestroom chairs alongside the writing desk or occasional table. Schedule suite sofas and dining sets separately, allowing clearance for doors, drawers and opened sleeper furniture. Coordinate beds and mattresses with the rest of the room package.
Project delivery and furniture installation
For projects in Russia and other countries, ASIO agrees the furniture specification and delivery plan after receiving the destination city, address and item schedule. The quotation defines the route, receiving party, shipment contents, packaging and delivery stages. Naming a city does not imply local stock: lead times depend on production and transport.
ASIO can arrange installation by separate agreement. Confirm the scope, contractor, cost, site readiness, unloading and access arrangements before ordering. Built-in items and floor fixings require approved drawings and substrate requirements.
For an initial quotation, send the project city, floor plans, furniture schedule, quantities and target furnishing completion date. For phased delivery, indicate when each space will be ready to receive furniture.
Furnishing questions
Can you work from our drawings?
Provide plans, elevations, appliance dimensions and finish schedules. Approve shop drawings, a control sample and dimensional tolerances before a production run.
Project assistant
Save an interior or furniture reference. The assistant will collect them in a brief for your consultation.
Topics: Furniture
Plans, spaces, quantities, timing and delivery city help us prepare a quote.