πŸ”₯ Furniture tour to Guangzhou β€” December 2026. Programme and booking
ASIO Β· International projects
ASIO PROJECTS

Bar and lounge furniture

Bar stools, high tables and upholstered seating support different parts of an evening. Link the furniture schedule to counter height, circulation, capacity and maintenance.

Project terms

Confirm the order scope, budget and schedule before detailed procurement work. Materials, quantities and ASIO’s services are agreed in the specification and contract.

View project terms

Furnishing ideas

Suitability, dimensions, materials and availability are confirmed during sourcing.

Original photograph Β· model reference

Bar stool

Original photograph Β· model reference

Lounge chair

Browse catalog

A sample collection of the models shown here. Ask ASIO for the full catalog and current ordering terms.

GUANGZHOU Β· FOSHAN

Furniture tour itinerary

Choose a date and topics, then save a preliminary itinerary in your brief.

Enquiries and bookings require separate confirmation.

Furniture tour itinerary
Topics
FURNITURE SOURCING

Counter height, seating and circulation

Counter and seat heights need to work together. A bar-stool label does not establish the right leg clearance, foot support or stability. Plan lounge seating separately, matching sofas and armchairs to low tables. Choose upholstery and finishes around the cleaning routine and expected use.

ASIO helps source furniture from factories in China and coordinate project procurement. The specification records models, quantities, dimensions, materials and finishes. Samples, packing, logistics and additional work are itemised separately. Services and delivery terms are agreed in the contract.

Project delivery and furniture installation

For projects in Russia and other countries, ASIO agrees the furniture specification and delivery plan after receiving the destination city, address and item schedule. The quotation defines the route, receiving party, shipment contents, packaging and delivery stages. Naming a city does not imply local stock: lead times depend on production and transport.

ASIO can arrange installation by separate agreement. Confirm the scope, contractor, cost, site readiness, unloading and access arrangements before ordering. Built-in items and floor fixings require approved drawings and substrate requirements.

For an initial quotation, send the project city, floor plans, furniture schedule, quantities and target furnishing completion date. For phased delivery, indicate when each space will be ready to receive furniture.

PROJECT SCOPE

Define the project scope.

01

Commercial bar stools

Start with counter height and leg clearance. Then review stability, footrests, back support and seat material.

02

High tables

Match the base and top in weight and dimensions. Layouts should accommodate guests and service movement.

03

Lounge seating

Sofas, armchairs and low tables work as a group. Coordinate their heights, spacing and comfort.

04

Finishes and maintenance

Check upholstery and surfaces against the cleaning routine. Discuss replaceable parts and repairs before the production order.

ONE BRIEF. A CONSIDERED PROCESS.

From your idea to a furnished space.

01

Vision & brief

Define the direction, spaces and priorities of your project.

02

Selection & samples

Compare pieces, finishes and operational requirements.

03

Production & inspection

Agree on the specification and pre-shipment inspection stages.

04

Delivery to your project

Plan logistics around the agreed scope and schedule.

FROM SELECTION TO PROCUREMENT

Furniture from China: selection to delivery.

Materials and intended use

For upholstered pieces, agree on the fabric, filling, construction and care method; for casegoods, on core materials, finishes, edges and hardware. Similar-looking models can differ in durability and maintenance. Testing and certification requirements should be defined for the specific property and market before ordering.

What determines the furnishing budget?

Costs depend on quantities, dimensions, materials, design complexity and order composition. Samples, packing, transport and site work should be itemised separately. Compare offers against one specification, with clear inclusions and exclusions.

Selection around your interior design

Layouts, visualizations and furniture schedules help match pieces to the interior. Custom dimensions or finishes need to be discussed with the manufacturer. Drawings, samples and permitted variations should be agreed before a production order; a photograph alone cannot replace a specification.

Delivery and project phases

The schedule includes selection, sample approval, production and transport. Confirm the destination, route, supply feasibility, receiving conditions and documentation before ordering. For phased projects, agree batch contents, labels and storage in advance.

BEFORE YOUR PROJECT BEGINS

Before ordering furniture.

What to prepare, how to define your order and where to start the conversation.

What do you need for a furnishing quote?

For an initial discussion, prepare plans, areas to furnish, quantities, references, delivery location, budget and target dates. First confirm that the project fits ASIO’s service terms, then agree the specification, samples and delivery estimate.

How do we choose the right bar-stool height?

Provide counter height, top thickness and any supports underneath. Compare seat height, leg clearance and footrest position. There is no single height suitable for every counter; review an approved dimensional drawing or a sample before ordering.

Can the dimensions and materials be changed?

Changes are considered for each item. Feasibility, cost and lead times depend on the construction and factory conditions. Custom details enter the order after dimensions, materials and technical requirements have been agreed.

How are samples reviewed before the main order?

Check dimensions, comfort, materials, colours and care against the agreed requirements. A pilot area can be discussed for repeated sets. Sample costs and timing require agreement; approved characteristics enter the batch specification.

How is the delivery schedule planned?

After clarifying the specification, quantities, custom changes and destination. Compare opening or occupancy dates with production, transport and site readiness. There is no single lead time for every project.

Do we need to visit China to select furniture?

Selection can start remotely with catalogs, plans and references. A visit helps compare comfort, textures and finishes in person. The programme follows your project brief; dates and showroom access require separate confirmation.

ASIO

Project assistant

Save an interior or furniture reference. The assistant will collect them in a brief for your consultation.

Bar and lounge furniture

Topics: Furniture

Plans, spaces, quantities, timing and delivery city help us prepare a quote.

Contact ASIO

Request a consultation

We use these details to respond to your request. Privacy policy