Bar stools and counter furniture in Singapore
Choose bar seating against counter height, guest dwell time and intended service. Bar-height and counter-height stools may require different dimensions and should not be ordered interchangeably.
A different mood for every space.
Interiors are visual references for selection, not completed-project claims.
Furnishing ideas
Suitability, dimensions, materials and availability are confirmed during sourcing.
Original photograph · model reference
Bar stool
Browse catalog
A sample collection of the models shown here. Ask ASIO for the full catalog and current ordering terms.
Furniture tour itinerary
Choose a date and topics, then save a preliminary itinerary in your brief.
Enquiries and bookings require separate confirmation.
Furniture tour itineraryPreparing your project
Site conditions
For premises in a managed complex, obtain access, service-lift and temporary-storage rules. If the room changes use during the day, check stacking, reconfiguration and furniture storage against the floor plan.
Receiving furniture on site
Provide the full address, receiving party, vehicle and doorway clearances, lift access and temporary storage space. Unloading, moving furniture to its final position and installation are agreed separately. Work backwards from the target furnishing completion date through samples, production, packing, transport and site readiness.
Your first ASIO brief
Save furniture and interior references to your selection. Add the city, property type, number of spaces and target furnishing completion date. Separate essential items from alternatives so the initial quotation can compare a clear scope.
Interior images are visual references for discussion. They are not presented as ASIO projects completed in this city.
Height and comfort
Check clearance below the counter, foot support and access to the seat. Specify backrests, arms and swivel mechanisms for the selected model.
Frames and fixings
Compare wood and metal constructions by finish, maintenance and intended use. Floor-mounted stools and load requirements need separate drawings and manufacturer confirmation.
Counters and back-bar furniture
Schedule cabinets, shelves and counters separately from refrigeration and professional equipment. Outdoor bar furniture requires materials and joints suited to the agreed exposure.
Project delivery and furniture installation
For projects in Russia and other countries, ASIO agrees the furniture specification and delivery plan after receiving the destination city, address and item schedule. The quotation defines the route, receiving party, shipment contents, packaging and delivery stages. Naming a city does not imply local stock: lead times depend on production and transport.
ASIO can arrange installation by separate agreement. Confirm the scope, contractor, cost, site readiness, unloading and access arrangements before ordering. Built-in items and floor fixings require approved drawings and substrate requirements.
For an initial quotation, send the project city, floor plans, furniture schedule, quantities and target furnishing completion date. For phased delivery, indicate when each space will be ready to receive furniture.
Furnishing questions
Can you match an existing counter?
Send counter height, top thickness, available space, seating quantities and references. Verify dimensions and comfort on a sample before committing to the batch.
Project assistant
Save an interior or furniture reference. The assistant will collect them in a brief for your consultation.
Topics: Furniture
Plans, spaces, quantities, timing and delivery city help us prepare a quote.