🔥 Furniture tour to Guangzhou — December 2026. Programme and booking
ASIO · Abu Dhabi
ASIO PROJECTS

Furniture procurement for property developers in Abu Dhabi

Residential developments, apartment portfolios and villa phases need repeatability and delivery coordination. Start with room typologies, a pilot package and one approved specification for production batches.

Project terms

Confirm the order scope, budget and schedule before detailed procurement work. Materials, quantities and ASIO’s services are agreed in the specification and contract.

View project terms

Furnishing ideas

Suitability, dimensions, materials and availability are confirmed during sourcing.

Original photograph · model reference

Sofa

Original photograph · model reference

Dining table

Original photograph · model reference

Dining chair

Browse catalog

A sample collection of the models shown here. Ask ASIO for the full catalog and current ordering terms.

GUANGZHOU · FOSHAN

Furniture tour itinerary

Choose a date and topics, then save a preliminary itinerary in your brief.

Enquiries and bookings require separate confirmation.

Furniture tour itinerary
Topics
FURNITURE SOURCING

Repeatable packages and phased deliveries

Procurement follows unit types and handover phases. A specification error can be repeated across many units, so approved versions need clear control. Scope shared amenities, apartment packages and spare items separately. Match batches to building readiness, receiving arrangements and storage capacity.

ASIO helps source furniture from factories in China and coordinate project procurement. The specification records models, quantities, dimensions, materials and finishes. Samples, packing, logistics and additional work are itemised separately. Services and delivery terms are agreed in the contract.

Preparing your project

Site conditions

For a phased opening, split the schedule by building, floor and area. Record receiving order, responsible contacts and storage; changing one phase must not confuse labels for the others.

Receiving furniture on site

Provide the full address, receiving party, vehicle and doorway clearances, lift access and temporary storage space. Unloading, moving furniture to its final position and installation are agreed separately. Work backwards from the target furnishing completion date through samples, production, packing, transport and site readiness.

Your first ASIO brief

Save furniture and interior references to your selection. Add the city, property type, number of spaces and target furnishing completion date. Separate essential items from alternatives so the initial quotation can compare a clear scope.

Interior images are visual references for discussion. They are not presented as ASIO projects completed in this city.

Project delivery and furniture installation

For projects in Russia and other countries, ASIO agrees the furniture specification and delivery plan after receiving the destination city, address and item schedule. The quotation defines the route, receiving party, shipment contents, packaging and delivery stages. Naming a city does not imply local stock: lead times depend on production and transport.

ASIO can arrange installation by separate agreement. Confirm the scope, contractor, cost, site readiness, unloading and access arrangements before ordering. Built-in items and floor fixings require approved drawings and substrate requirements.

For an initial quotation, send the project city, floor plans, furniture schedule, quantities and target furnishing completion date. For phased delivery, indicate when each space will be ready to receive furniture.

PROJECT SCOPE

Define the project scope.

01

Repeatable packages

Define furniture and quantities for each apartment or villa type. Give specification changes their own version.

02

Shared amenities

Lobbies, club lounges and common terraces have different usage from private apartments. Scope them as separate packages.

03

Pilot and approvals

A pilot space helps review dimensions, materials and assembly. Approved characteristics become the basis for repeated batches.

04

Phased delivery

Plan batches, labels, receiving and storage. Agree site readiness and on-site responsibilities before dispatch.

ONE BRIEF. A CONSIDERED PROCESS.

From your idea to a furnished space.

01

Vision & brief

Define the direction, spaces and priorities of your project.

02

Selection & samples

Compare pieces, finishes and operational requirements.

03

Production & inspection

Agree on the specification and pre-shipment inspection stages.

04

Delivery to your project

Plan logistics around the agreed scope and schedule.

FROM SELECTION TO PROCUREMENT

Furniture from China: selection to delivery.

Materials and intended use

For upholstered pieces, agree on the fabric, filling, construction and care method; for casegoods, on core materials, finishes, edges and hardware. Similar-looking models can differ in durability and maintenance. Testing and certification requirements should be defined for the specific property and market before ordering.

What determines the furnishing budget?

Costs depend on quantities, dimensions, materials, design complexity and order composition. Samples, packing, transport and site work should be itemised separately. Compare offers against one specification, with clear inclusions and exclusions.

Selection around your interior design

Layouts, visualizations and furniture schedules help match pieces to the interior. Custom dimensions or finishes need to be discussed with the manufacturer. Drawings, samples and permitted variations should be agreed before a production order; a photograph alone cannot replace a specification.

Delivery and project phases

The schedule includes selection, sample approval, production and transport. Confirm the destination, route, supply feasibility, receiving conditions and documentation before ordering. For phased projects, agree batch contents, labels and storage in advance.

BEFORE YOUR PROJECT BEGINS

Before ordering furniture.

What to prepare, how to define your order and where to start the conversation.

What do you need for a furnishing quote?

For an initial discussion, prepare plans, areas to furnish, quantities, references, delivery location, budget and target dates. First confirm that the project fits ASIO’s service terms, then agree the specification, samples and delivery estimate.

What should be agreed before repeating a pilot package?

Record products, dimensions, materials, finishes, quantities and acceptable variations. Give different apartment or villa types their own schedules. Establish delivery phases, labels and substitution approvals before production starts.

Can the dimensions and materials be changed?

Changes are considered for each item. Feasibility, cost and lead times depend on the construction and factory conditions. Custom details enter the order after dimensions, materials and technical requirements have been agreed.

How are samples reviewed before the main order?

Check dimensions, comfort, materials, colours and care against the agreed requirements. A pilot area can be discussed for repeated sets. Sample costs and timing require agreement; approved characteristics enter the batch specification.

How is the delivery schedule planned?

After clarifying the specification, quantities, custom changes and destination. Compare opening or occupancy dates with production, transport and site readiness. There is no single lead time for every project.

Can furniture selection begin remotely?

Yes. Share plans, dimensions and references, then save relevant items from the gallery. Finish and seating approval may require a sample; its format and cost are discussed separately. A furniture tour lets you compare options in person.

ASIO

Project assistant

Save an interior or furniture reference. The assistant will collect them in a brief for your consultation.

Abu Dhabi

Topics: Furniture

Plans, spaces, quantities, timing and delivery city help us prepare a quote.

Contact ASIO

Request a consultation

We use these details to respond to your request. Privacy policy